Home / Services / General Contracting / General Building Construction / Multi-Trade Construction

Multi-Trade Construction in the Bay Area

Structural and non-structural building work for homes and small buildings, planned and built under one scope.

X1 Construction serves homeowners in San Francisco, the Peninsula and the South Bay. Every project starts with a home visit and a written estimate.

Completed X1 interior renovation

About General Contracting

General contracting covers projects where several trades have to work in the right order: framing, plumbing, electrical, drywall, finishes and inspections. One scope and one schedule keeps those pieces from colliding.

X1 handles additions, garage conversions, ADUs and commercial renovations by defining the scope in writing after a site visit, coordinating licensed subcontractors for specialty trades, and supporting permit filing where the city requires it.

About Multi-Trade Construction

  • Framing, structural repairs and openings
  • Interior build-outs and reconfigurations
  • Coordination of plumbing, electrical and other trades
  • Permit support and inspections
  • Finish carpentry, drywall and paint to close out the work

What affects the price

  • Structural scope and engineering needs
  • Number of trades involved
  • Permit and plan-review path
  • Material lead times

Related work

Typical ranges for General Building Construction

Multi-Trade Construction is part of General Building Construction. These are the working ranges for that service. These are X1 working ranges, approximate and preliminary, not a quote. Your final price comes from a written estimate after we see your space.

Small project

$8K-$30K

A single room or limited scope

Construction: 1-4 weeks

Typical project

$30K-$120K

Several rooms or trades

Construction: 4-12 weeks

Large project

$120K-$400K

Major scope with engineering

Construction: 12-30 weeks

Approximate prices and timelines. Prices include materials and labor.

Timeline by stage (approximate)

StageTypical time
Planning and estimate2-6 weeks (scope and drawings)
Permits4-16 weeks for plan review where required
Material procurement2-8 weeks
Construction: Small project1-4 weeks
Construction: Typical project4-12 weeks
Construction: Large project12-30 weeks

Permits and material ordering run at the same time. Timelines are approximate and include permitting and procurement. They are not specific to any one city.

What the price includes

  • ✓ Labor
  • ✓ Materials
  • ✓ Demolition
  • ✓ Debris removal
  • ✓ Material delivery
  • ✓ Permit filing where required (city fees are extra)
  • ✗ Design project (separate step)

This is not a final estimate. Prices and timelines are approximate. Your final price and schedule come from a written estimate after we see your space.

Estimate Your General Building Construction

Choose the size and material level to see a preliminary range. No contact details needed.

Project size

Material level

How the work is done

  • Planning and permits usually take longer than construction on larger projects, so the timeline table separates them.
  • Structural changes often need drawings and sometimes engineering before the city will issue a permit.
  • Utility work (water, sewer, power) is scheduled around inspections and utility lead times.
  • Plumbing, electrical and roofing work is performed by licensed subcontractors.

Tips for clients

  • Decide what you want the space to do before choosing finishes. Layout changes are the biggest cost driver.
  • Ask for the scope in writing, including what is not included.
  • Check your city's planning rules for additions, ADUs and garage conversions early. Some require design review or parking replacement.
  • Plan for a temporary kitchen or bathroom if you will live in the home during work.
  • Before the visit, think about: structural scope and engineering needs; number of trades involved; permit and plan-review path; material lead times.

How it works

  1. 1

    Estimate visit

    We visit your home, look at the space and talk through what you want. You get a written scope and cost before any work starts.

    Typical time (approximate): Home visit within about a week of your request

  2. 2

    Agreement and planning

    We agree on the scope, schedule, materials and any permit needs in writing.

    Typical time (approximate): See the timeline by stage

  3. 3

    Work and walkthrough

    We complete the agreed work, keep the site clean and finish with a final walkthrough.

    Typical time (approximate): See construction time in the pricing table

Why Choose X1 Construction

“Very nice guys, helped me with my bathroom renovation, very responsive and focused in quality.”

Tim A.Yelp review

“It's hard to find contractors you can trust for large remodeling projects, but these guys really delivered.”

Kerry FirstGoogle review

“We did a full renovation of our house in San Francisco. Roman and his team did an amazing job. Thank you, guys.”

Aleksandr ShishovGoogle review

100-day service guarantee

Every project is backed by a 100-day service guarantee.

Licensed subcontractors for specialty trades

All plumbing, electrical and roofing work is performed by licensed subcontractors.

Written estimate first

We inspect your space in person, then outline the scope and cost before work starts.

Frequently Asked Questions

What counts as general building construction?

Projects that combine structural work, several trades and permits, such as reconfiguring interior walls or rebuilding part of a home. We define the scope in a written estimate after a site visit.

Do you handle the permit?

X1 can organize permits and inspections for clients. The city decides what your project needs.

How do I get an estimate?

Call 415-475-2911 or send your project details with the form on this page. We visit, look at the space and give you a written estimate.

Are these prices final?

No. They are X1 working ranges, approximate and preliminary, not a quote. Your final price comes from a written estimate after we see your space.

Multi-Trade Construction by city

  • Multi-Trade Construction in San Francisco
  • Multi-Trade Construction in Brisbane
  • Multi-Trade Construction in Colma
  • Multi-Trade Construction in Daly City
  • Multi-Trade Construction in South San Francisco
  • Multi-Trade Construction in Pacifica
  • Multi-Trade Construction in San Bruno
  • Multi-Trade Construction in Millbrae
  • Multi-Trade Construction in Burlingame
  • Multi-Trade Construction in Hillsborough
  • Multi-Trade Construction in San Mateo
  • Multi-Trade Construction in Foster City
  • Multi-Trade Construction in Belmont
  • Multi-Trade Construction in San Carlos
  • Multi-Trade Construction in Redwood City
  • Multi-Trade Construction in Atherton
  • Multi-Trade Construction in Menlo Park
  • Multi-Trade Construction in East Palo Alto
  • Multi-Trade Construction in Woodside
  • Multi-Trade Construction in Portola Valley
  • Multi-Trade Construction in Half Moon Bay
  • Multi-Trade Construction in Palo Alto
  • Multi-Trade Construction in Los Altos
  • Multi-Trade Construction in Los Altos Hills
  • Multi-Trade Construction in Mountain View
  • Multi-Trade Construction in Sunnyvale
  • Multi-Trade Construction in Cupertino
  • Multi-Trade Construction in Santa Clara
  • Multi-Trade Construction in Milpitas
  • Multi-Trade Construction in San Jose
  • Multi-Trade Construction in Campbell
  • Multi-Trade Construction in Saratoga
  • Multi-Trade Construction in Monte Sereno
  • Multi-Trade Construction in Los Gatos

Related services

Get a free estimate

Tell us about your project. We reply with next steps and schedule a visit.

Phone: 415-475-2911 · office@x1-construction.com