Home / Services / Electrical / EV Charger Installation

EV Charger Installation in the Bay Area

Level 2 home charger installation with a dedicated circuit.

X1 Construction serves homeowners in San Francisco, the Peninsula and the South Bay. Every project starts with a home visit and a written estimate.

Completed kitchen with new lighting

About Electrical

Electrical work covers wiring, panels, circuits and devices. Large projects such as whole-house rewiring, panel and service upgrades, subpanels and rough-in come first, followed by dedicated circuits, EV chargers, light fixtures, outlets and switches.

Electrical work is performed by licensed subcontractors, coordinated by X1 with the rest of the project.

What this service covers

  • Load and panel check
  • Dedicated circuit wiring
  • Charger mounting and connection
  • Testing and setup

What affects the price

  • Distance from the panel
  • Panel capacity
  • Charger model
  • Utility or local requirements

Specific work

Pricing and Timeline

These are X1 working ranges, approximate and preliminary, not a quote. Your final price comes from a written estimate after we see your space.

Basic install

$800-$2K

Short run, panel has capacity

Construction: Half a day to a day

Typical install

$2K-$4.5K

Longer run

Construction: 1 to 2 days

With panel work

$4.5K-$12K

Panel upgrade needed

Construction: 2 to 5 days

Approximate prices and timelines. Prices include materials and labor.

Timeline by stage (approximate)

StageTypical time
Planning and estimateAbout 1 week
Permits0-2 weeks, only if the city requires one
Material procurement0-2 weeks
Construction: Basic installHalf a day to a day
Construction: Typical install1 to 2 days
Construction: With panel work2 to 5 days

Permits and material ordering run at the same time. Timelines are approximate and include permitting and procurement. They are not specific to any one city.

What the price includes

  • ✓ Labor
  • ✓ Materials
  • ✓ Demolition
  • ✓ Debris removal
  • ✓ Material delivery
  • ✓ Permit filing where required (city fees are extra)
  • ✗ Design project (separate step)

This is not a final estimate. Prices and timelines are approximate. Your final price and schedule come from a written estimate after we see your space.

Estimate Your EV Charger Installation

Choose the size and material level to see a preliminary range. No contact details needed.

Project size

Material level

How the work is done

  • Panel capacity decides whether new circuits, EV chargers or appliances can be added.
  • Rough-in work must pass inspection before walls close.
  • Rewiring and panel work may involve the utility and the city. Scope and restoration are written into the estimate.

Tips for clients

  • Know the age and size of your panel before the visit.
  • Tell us about planned additions such as an EV charger or heat pump so we can size the work once.
  • Ask what wall or ceiling repair is included for any wiring that needs access.
  • Before the visit, think about: distance from the panel; panel capacity; charger model; utility or local requirements.

How it works

  1. 1

    Estimate visit

    We visit your home, look at the space and talk through what you want. You get a written scope and cost before any work starts.

    Typical time (approximate): Home visit within about a week of your request

  2. 2

    Agreement and planning

    We agree on the scope, schedule, materials and any permit needs in writing.

    Typical time (approximate): See the timeline by stage

  3. 3

    Work and walkthrough

    We complete the agreed work, keep the site clean and finish with a final walkthrough.

    Typical time (approximate): See construction time in the pricing table

Why Choose X1 Construction

“Very nice guys, helped me with my bathroom renovation, very responsive and focused in quality.”

Tim A.Yelp review

“It's hard to find contractors you can trust for large remodeling projects, but these guys really delivered.”

Kerry FirstGoogle review

“We did a full renovation of our house in San Francisco. Roman and his team did an amazing job. Thank you, guys.”

Aleksandr ShishovGoogle review

100-day service guarantee

Every project is backed by a 100-day service guarantee.

Licensed subcontractors for specialty trades

All plumbing, electrical and roofing work is performed by licensed subcontractors.

Written estimate first

We inspect your space in person, then outline the scope and cost before work starts.

Frequently Asked Questions

Do you supply the charger?

Either way. We note it in the estimate.

Will I need a new panel?

Sometimes. A load check decides.

Do I need a new panel for an EV charger?

Sometimes. A load check of your existing panel decides it.

How do I get an estimate?

Call 415-475-2911 or send your project details with the form on this page. We visit, look at the space and give you a written estimate.

Are these prices final?

No. They are X1 working ranges, approximate and preliminary, not a quote. Your final price comes from a written estimate after we see your space.

EV Charger Installation by city

  • EV Charger Installation in San Francisco
  • EV Charger Installation in Brisbane
  • EV Charger Installation in Colma
  • EV Charger Installation in Daly City
  • EV Charger Installation in South San Francisco
  • EV Charger Installation in Pacifica
  • EV Charger Installation in San Bruno
  • EV Charger Installation in Millbrae
  • EV Charger Installation in Burlingame
  • EV Charger Installation in Hillsborough
  • EV Charger Installation in San Mateo
  • EV Charger Installation in Foster City
  • EV Charger Installation in Belmont
  • EV Charger Installation in San Carlos
  • EV Charger Installation in Redwood City
  • EV Charger Installation in Atherton
  • EV Charger Installation in Menlo Park
  • EV Charger Installation in East Palo Alto
  • EV Charger Installation in Woodside
  • EV Charger Installation in Portola Valley
  • EV Charger Installation in Half Moon Bay
  • EV Charger Installation in Palo Alto
  • EV Charger Installation in Los Altos
  • EV Charger Installation in Los Altos Hills
  • EV Charger Installation in Mountain View
  • EV Charger Installation in Sunnyvale
  • EV Charger Installation in Cupertino
  • EV Charger Installation in Santa Clara
  • EV Charger Installation in Milpitas
  • EV Charger Installation in San Jose
  • EV Charger Installation in Campbell
  • EV Charger Installation in Saratoga
  • EV Charger Installation in Monte Sereno
  • EV Charger Installation in Los Gatos

Related services

Get a free estimate

Tell us about your project. We reply with next steps and schedule a visit.

Phone: 415-475-2911 · office@x1-construction.com