Home / Services / General Contracting / ADU Construction / Conversion ADUs

Conversion ADUs in the Bay Area

Building an accessory dwelling unit: a detached, attached or converted second unit on your property.

X1 Construction serves homeowners in San Francisco, the Peninsula and the South Bay. Every project starts with a home visit and a written estimate.

Completed X1 interior renovation

About General Contracting

General contracting covers projects where several trades have to work in the right order: framing, plumbing, electrical, drywall, finishes and inspections. One scope and one schedule keeps those pieces from colliding.

X1 handles additions, garage conversions, ADUs and commercial renovations by defining the scope in writing after a site visit, coordinating licensed subcontractors for specialty trades, and supporting permit filing where the city requires it.

About Conversion ADUs

  • Site work, foundation and framing
  • Utility connections for water, sewer and power
  • Interior build-out: kitchen, bath, flooring and finish
  • Permit support and inspections
  • Coordination of licensed subcontractors for specialty trades

What affects the price

  • Detached, attached or conversion type
  • Utility connection distance and capacity
  • Unit size and finish level
  • City planning review and fees

Related work

Typical ranges for ADU Construction

Conversion ADUs is part of ADU Construction. These are the working ranges for that service. These are X1 working ranges, approximate and preliminary, not a quote. Your final price comes from a written estimate after we see your space.

Conversion ADU

$120K-$250K

Converts existing space

Construction: 12-22 weeks

Detached ADU

$250K-$450K

New detached unit

Construction: 20-36 weeks

Large ADU

$450K-$700K

Larger or two-story unit

Construction: 30-52 weeks

Approximate prices and timelines. Prices include materials and labor.

Timeline by stage (approximate)

StageTypical time
Planning and estimate2-6 weeks (scope and drawings)
Permits4-16 weeks for plan review where required
Material procurement2-8 weeks
Construction: Conversion ADU12-22 weeks
Construction: Detached ADU20-36 weeks
Construction: Large ADU30-52 weeks

Permits and material ordering run at the same time. Timelines are approximate and include permitting and procurement. They are not specific to any one city.

What the price includes

  • ✓ Labor
  • ✓ Materials
  • ✓ Demolition
  • ✓ Debris removal
  • ✓ Material delivery
  • ✓ Permit filing where required (city fees are extra)
  • ✗ Design project (separate step)

This is not a final estimate. Prices and timelines are approximate. Your final price and schedule come from a written estimate after we see your space.

Estimate Your ADU Construction

Choose the size and material level to see a preliminary range. No contact details needed.

Project size

Material level

How the work is done

  • Planning and permits usually take longer than construction on larger projects, so the timeline table separates them.
  • Structural changes often need drawings and sometimes engineering before the city will issue a permit.
  • Utility work (water, sewer, power) is scheduled around inspections and utility lead times.
  • Plumbing, electrical and roofing work is performed by licensed subcontractors.

Tips for clients

  • Decide what you want the space to do before choosing finishes. Layout changes are the biggest cost driver.
  • Ask for the scope in writing, including what is not included.
  • Check your city's planning rules for additions, ADUs and garage conversions early. Some require design review or parking replacement.
  • Plan for a temporary kitchen or bathroom if you will live in the home during work.
  • Before the visit, think about: detached, attached or conversion type; utility connection distance and capacity; unit size and finish level; city planning review and fees.

How it works

  1. 1

    Estimate visit

    We visit your home, look at the space and talk through what you want. You get a written scope and cost before any work starts.

    Typical time (approximate): Home visit within about a week of your request

  2. 2

    Agreement and planning

    We agree on the scope, schedule, materials and any permit needs in writing.

    Typical time (approximate): See the timeline by stage

  3. 3

    Work and walkthrough

    We complete the agreed work, keep the site clean and finish with a final walkthrough.

    Typical time (approximate): See construction time in the pricing table

Why Choose X1 Construction

“Very nice guys, helped me with my bathroom renovation, very responsive and focused in quality.”

Tim A.Yelp review

“It's hard to find contractors you can trust for large remodeling projects, but these guys really delivered.”

Kerry FirstGoogle review

“We did a full renovation of our house in San Francisco. Roman and his team did an amazing job. Thank you, guys.”

Aleksandr ShishovGoogle review

100-day service guarantee

Every project is backed by a 100-day service guarantee.

Licensed subcontractors for specialty trades

All plumbing, electrical and roofing work is performed by licensed subcontractors.

Written estimate first

We inspect your space in person, then outline the scope and cost before work starts.

Frequently Asked Questions

Who decides if I can build an ADU?

The city's planning and building offices set the rules for your lot. State law also shapes ADU approvals, and we confirm the path with the city during the estimate.

How long does an ADU take?

Planning and permits often take longer than construction. Our draft timeline separates planning, permits, procurement and construction so you can see each stage.

How do I get an estimate?

Call 415-475-2911 or send your project details with the form on this page. We visit, look at the space and give you a written estimate.

Are these prices final?

No. They are X1 working ranges, approximate and preliminary, not a quote. Your final price comes from a written estimate after we see your space.

Conversion ADUs by city

  • Conversion ADUs in San Francisco
  • Conversion ADUs in Brisbane
  • Conversion ADUs in Colma
  • Conversion ADUs in Daly City
  • Conversion ADUs in South San Francisco
  • Conversion ADUs in Pacifica
  • Conversion ADUs in San Bruno
  • Conversion ADUs in Millbrae
  • Conversion ADUs in Burlingame
  • Conversion ADUs in Hillsborough
  • Conversion ADUs in San Mateo
  • Conversion ADUs in Foster City
  • Conversion ADUs in Belmont
  • Conversion ADUs in San Carlos
  • Conversion ADUs in Redwood City
  • Conversion ADUs in Atherton
  • Conversion ADUs in Menlo Park
  • Conversion ADUs in East Palo Alto
  • Conversion ADUs in Woodside
  • Conversion ADUs in Portola Valley
  • Conversion ADUs in Half Moon Bay
  • Conversion ADUs in Palo Alto
  • Conversion ADUs in Los Altos
  • Conversion ADUs in Los Altos Hills
  • Conversion ADUs in Mountain View
  • Conversion ADUs in Sunnyvale
  • Conversion ADUs in Cupertino
  • Conversion ADUs in Santa Clara
  • Conversion ADUs in Milpitas
  • Conversion ADUs in San Jose
  • Conversion ADUs in Campbell
  • Conversion ADUs in Saratoga
  • Conversion ADUs in Monte Sereno
  • Conversion ADUs in Los Gatos

Related services

Get a free estimate

Tell us about your project. We reply with next steps and schedule a visit.

Phone: 415-475-2911 · office@x1-construction.com